Descargar Imprimir esta página

Sauder Cannery Bridge Serie Instrucciones De Montaje página 24

Ocultar thumbs Ver también para Cannery Bridge Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 15
å
1
- Go to Pages 18-19 and cut out the templates for attaching your Hutch to the base unit.
st
å
2
- Use masking tape to fasten the templates to the edges and surface of the base unit top.
nd
å
3
- Drill a 1/8" hole through each of the two marked locations on the templates and into the base top.
rd
å
4
- Remove the templates. With someone's help, place the Hutch onto the base top. Center the Hutch on the base unit
th
with the back edges even with the back edge of the base top.
å
5
- Fasten the ENDS (A and B) to the base top. Use two 2-1/2" FLAT HEAD SCREWS (15).
th
Tape each template to
the corresponding corner
of the base unit top.
2-1/2" FLAT HEAD SCREW
(2 used in this step)
Page 24
2
nd
3
rd
15
www.sauder.com/service
Electric drill with 1/8" bit
After drilling each 1/8"
hole into the base top,
remove the templates.
A
5
th
4
th
B
429512

Publicidad

loading

Este manual también es adecuado para:

Cannery bridge 429512