Descargar Imprimir esta página

AQUALUX Vesuvio VES06R Manual De Usuario E Instalacion página 32

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 78
All manuals and user guides at all-guides.com
Trial after first installation
Attention:
Always Start the water pump before turning on this machine
Turn off this machine before turning off the water pump.
Inspection before connecting power supply
- Check the installation of the whole machine and the pipe connections according to the
pipe connecting drawing.
- Check the electric wiring according to the electric wiring diagram, and ground well.
- Make sure no blockage on the air inlet and outlet, or the efficiency of the heater will be
reduced or cause machine to stop operation.
Trial after connecting power supply
- Connect the machine with electric power supply, then relative information will display on
the LED controller.
(For Detail operation of LED controller, please refer to Chapter "Operation guide".)
- Start the water pump before turning on the Machine to avoid any damage.
- Press power on/off on LED controller to turn on/off machine.
- on the first start of machine, please check if there is any water leakage in the piping
connection system. Then set suitable temperature.
- After the swimming pool heater runs, check if there is any abnormal noise or smell.
In any abnormal situation, such as serious noise, smell or smoking, please cut the power
supply immediately and inform resellers, never try to repair it by yourself.
Special cases:
- In the event of an unexpected power cut, the heat pump will automatically restart. Check
the setting and adjust if necessary.
- In the event of an expected power cut, switch off the heat pump. When power is restored,
switch on the pump, check the settings and adjust if necessary.
- Always switch off the machine in stormy weather.
12

Publicidad

loading

Este manual también es adecuado para:

Vesuvio ves08rVesuvio ves10rVesuvio ves12r