Descargar Imprimir esta página

Fronius Smart Meter 240V-3 UL Manual De Instrucciones página 22

Ocultar thumbs Ver también para Smart Meter 240V-3 UL:

Publicidad

Position of the primary meter in the consumption branch. *Termination resistance R 120 Ohm
Position of the primary meter at the feed-in point. *Termination resistance R 120 Ohm
The following must be observed in a multi meter system:
-
-
-
-
22
Connect the primary meter and the battery to different channels (recom-
mended).
Distribute the remaining Modbus participants evenly.
Each Modbus address is assigned only once.
Place the terminating resistors individually for each channel.

Publicidad

loading

Este manual también es adecuado para:

Smart meter 480v-3 ulSmart meter 600v-3 ul