2. Slide base sway tower body up to
expose tubes and insert base
sway tower (E) tubes into
vertical tubes in base legs (D).
CHECK that buttons on base
sway tower are visible in hole in
base legs (D) as shown.
2. Deslice el cuerpo de la torre de
bamboleo de la base para expon-
er los tubos e inserte los tubos
de la torre de bamboleo de la
base (E) en los tubos verticales
de las patas de la base (D).
VERIFIQUE que los botones de la
torre de bamboleo de la base
estén visibles en los orificios de
las patas de la base (D) como se
muestra.
3. Place base sway tower and
assembled legs on back. Align
screw holes in base plate (D)
with screw holes in base sway
tower (B) and screw 4 screws
(G) up through bottom of base
plate (D). Avoid stripping screws
by not over tightening screws into
base.
CHECK that screws (G) are
completely seated and not
sticking out beyond bottom of
base plate (D).
3. Coloque la torre de bamboleo de
la base y las patas montadas en
la parte posterior. Alinee los
orificios de los tornillos en la
placa de la base (D) con los
orificios de los tornillos en la
torre de bamboleo de la base (B)
y atornille 4 tornillos (G) a través
de la parte inferior de la placa de
la base (D). Evite pasar de rosca
los tornillos no apretándolos en
exceso en la base. VERIFIQUE
que los tornillos (G) estén
completamente asentados y que
no sobresalgan más allá de la
parte inferior de la placa de la
base (D).
SNAP!
¡CRAC!
11