2. Installation and Setup
2
Illustration 2.8: Parallel Configuration
The inverter runs an automatic PV configuration test just after connection to grid. During this test
the configuration of the PV modules is determined. The status of the test and the result can be
found in menu B in the display. The inverter will always run according to the configuration of the
PV modules.
2.1.4. AC Connection
Ensure that the power supply is disengaged using the power disconnect switch before connecting
the power cable.
When connecting the power cable to the socket, ensure that all cables are firmly attached to
prevent bad connections.
Connection to the AC grid is established by means of an AC connector. The connector is located
on the cabinet exterior.
Installation of the AC Connector:
•
•
•
•
•
10
The inverter must be connected
to the earth wire in order to pre-
vent injury to the user.
First slide pressure screw and seal ring over the cable.
Connect individual cores to bush insert row by row:
-
Connect PE earth conductor to screw terminal with earthing symbol.
-
Connect zero conductor N to screw terminal.
-
Connect phase L to screw terminal L
Check that cores are connected properly.
Slide the cap over the bush insert until locking catch is in correct position.
Now slide seal ring into the cap, and tighten the pressure screw.
Parallel Configuration
Parallel configuration is used when all PV pan-
els are identical both in type and in system in-
stallation.
PowerConcept set for parallel configuration.
Make sure the AC grid is switch-
ed off at the mains breaker be-
fore connecting the mains cable.
L00410289-03_3m