Install "T" Handles (cont.)
Slip O-rings over the endpiece threads and onto shoulder of each
endpiece.
Screw the endpieces into the centerpiece until tight.
7. Complete the Installation
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks.
Open the hot and cold valves and check for leaks.
Run the water for about a minute.
Turn the hot and cold water valves off.
1031377-2-B
10
Kohler Co.