Descargar Imprimir esta página

Kohler K-8253 Instrucciones De Montaje página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

T-Handle
Centerpiece
O-Ring
Color Ring
Screw
Endpiece
Screw
Handle Stem/Skirt
6. Install "T" Handles
Discard the thread protectors and install the gasket on the bottom
of the escutcheon.
Turn the escutcheon clockwise onto the valve until it contacts the
finished wall.
Place the spline adapter onto the valve stem.
Place the handle stem/skirt over the valve and fasten it to the
valve stem using the provided lockwasher and screw. Make sure
to align the eyelets in the handle stem/skirt so they point to other
handle.
Tighten using a 5/32" hex key.
Place the centerpiece onto the handle stem/skirt situated with the
eyelet holes clearly visible.
Fasten the centerpiece in place by inserting two screws (flat
surface facing out). Place one screw into each end of the
centerpiece and tighten using the 5/32" hex key.
Slip each color ring over the endpiece threads and onto the
shoulder of each endpiece.
Kohler Co.
Split Finish T-Handle
Endpiece
Color Ring
O-Ring
Screw
Lockwasher
Eyelets
Valve Stem
9
Brass
Ring
Brass Ring
Spline
Adapter
Escutcheon
Gasket
Valve
1031377-2-B

Publicidad

loading