5.1 Installation to Full Body Harness
Installation for both Single-leg and Twin-leg configurations of the FT-X
SRL-P follow the same steps listed below:
Step 1: On the FBH, lift the dorsal D-ring to the up-pointing position, then loosen the intersection of
the two web straps that pass through the D-ring slot to create slacked loops of about 2" as shown in
Figure 5A. Note that some harnesses may have a built-in tunnel.
Step 2: Depress both release buttons and slide the locking bar into the open position as shown in
Figure 5B.
Step 3: Attach the connector to the slacked loops by inserting the locking bar through the slacked
loops as shown in Figure 5C.
Step 4: Make sure the locking bar is in the fully inserted and in the locked position, see Figure 5D.
A
C
5.2 Attaching to an Anchorage
Examine the work area for possible hazards. Take caution to avoid overhead hazards such as cranes,
poles, overhead power cables, and walking/working surface hazards such as power cables, welding
leads, air and fluid hoses, including obstruction hazards such as vertical columns and stacks of
materials on the lower level. Eliminate hazards where possible.
Ensure the anchorage provides the Minimum Required Fall Clearance (MRFC) in the fall path below the
walking/working surface to prevent striking the lower level or an obstruction during a fall event. Take
9
Figure 5 - FT-X
Cable Class 2 Leading Edge SRL-P Installation
TM
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D
Cable Class 2 Leading Edge
TM
B
Push
Pull
412-06112 Rev D
412-06112 Rev D
D
412-06112 Rev D
412-06112 Rev D
Push
Push
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D
412-06112 Rev D

Publicidad

loading