Installation
Installation
Installation requirements
Installation
Connecting tool
The tool should, via its correct Power Focus drive unit, be connected to the mains, 230V/50Hz alterna-
tively 115V/ 60Hz, single phase. See instructions for your Power Focus drive unit.
Tool display
The tool display is turned on from the controller.
On Power Focus 4000:
■
Push the Prog button
■
Use the navigation buttons to follow the path > Tool > Configuration > Accessory bus > ST bus >
Mode
Socket release function
It is recommended to use the socket release function on all the ETP ST101 tools. When the function is en-
abled, the socket rotates backwards 3
reaction bar and to make it easier to remove the tool.
The socket release function is turned on from the controller.
On Power Focus 4000:
■
Push the Prog button
■
Use the navigation buttons to follow the path > Pset > Programming+ > Options > Socket release >
Mode On
Grounding
If the tool is mounted in a handheld or hand guided fixture, the fixture should be connected to the drive us-
ing a separate 2.5mm
Installation instructions
Fitting of the tool cable
■
Security check that the cable type is correct
■
Align the cable connector using the two asymmetrically positioned heads on the connector to fit in the
slots in the tool handle.
■
Tighten the lock nut.
■
Security check that the connection is correct by pulling, pushing and turning the cable connector
(there should be no movement).
The tool has a built in electronic memory chip that will transmit the torque transducer calibration value
and angle pulses to the POWER FOCUS/drive unit. Any changes made of these values in the
POWER FOCUS while the tool is connected will be stored in the tool memory.
6
o
after a completed tightening. The aim is to reduce tension on the
2
grounding cable.
© Atlas Copco Industrial Technique AB - 9836 8111 00
EN
ETDST61-70-13-T25