on stringent quality requirements which guarantee the perfect
operation of the device.
English--KHP
Thank you for placing your trust in our company by purchasing
the Weller KHP / KHP 81 Stop + Go Rest. Production was based
1. Caution!
on stringent quality requirements which guarantee the perfect
Please read these Operating Instructions and the attached
operation of the device.
Safety Information carefully prior to initial operation. Failure to
observe the safety regulations results in a risk to life and limb.
1. Caution!
The manufacturer shall not be liable for damage resulting from
Please read these Operating Instructions and the attached
misuse of the machine or unauthorised alterations.
Safety Information carefully prior to initial operation. Failure to
observe the safety regulations results in a risk to life and limb.
The Weller KHP / KHP 81 Stop + Go Rest corresponds to the EC
Declaration of Conformity in accordance with the basic safety
The manufacturer shall not be liable for damage resulting from
requirements of Directives 2004/108/EEC, 2006/95/EEC and
misuse of the machine or unauthorised alterations.
2011/65/EU /(RoHS).
The Weller KHP / KHP 81 Stop + Go Rest corresponds to the EC
Declaration of Conformity in accordance with the basic safety
2. Description KHP / KHP 81
requirements of Directives 2004/108/EEC, 2006/95/EEC and
The KHP / KHP 81 Stop + Go Rest is a switch-off and follow-up
2011/65/EU /(RoHS).
control for the WFE soldering fume extraction device. The
soldering iron rest has a zero-voltage guide connection to the
control unit.
2. Description KHP / KHP 81
In rest KHP 81, the light signal is transmitted to the control unit by
The KHP / KHP 81 Stop + Go Rest is a switch-off and follow-up
an LED. In the case of rest KHP, the light inlet is
control for the WFE soldering fume extraction device. The
located in the holder funnel.
soldering iron rest has a zero-voltage guide connection to the
The solder fume extractor cuts out approximately 20 sec.
control unit.
after the soldering gun is placed in the holder.
In rest KHP 81, the light signal is transmitted to the control unit by
an LED. In the case of rest KHP, the light inlet is
3. Commissioning
located in the holder funnel.
Check that the mains voltage is consistent with the information
The solder fume extractor cuts out approximately 20 sec.
on the type plate. If the mains voltage is correct, plug the con-
after the soldering gun is placed in the holder.
trol unit into an earthed safety socket.The green LED (2) indica-
tes that the system is ready to operate. The control unit is
3. Commissioning
Check that the mains voltage is consistent with the information
Technical Data
on the type plate. If the mains voltage is correct, plug the con-
trol unit into an earthed safety socket.The green LED (2) indica-
Mains voltage:
tes that the system is ready to operate. The control unit is
Power consumption:
Cutting-off pressure:
Technical Data
Mains fuse:
Protection Class:
Mains voltage:
Dimensions of control unit:
Power consumption:
Cutting-off pressure:
19
Mains fuse:
Protection Class:
Dimensions of control unit:
24
19
230 V AC
6 W
3.5-7 bars
T 0.4 A (5x20)
2
230 V AC
137 x 75 x 90
6 W
3.5-7 bars
T 0.4 A (5x20)
2
137 x 75 x 90
second light guide inlet has to be kept sealed. To connect the
light guide (1) loosen the clamp nut and insert the light guide as
far as the stop, then screw up the nut finger-tight. Now connect
equipped for the operation of 2 soldering iron rests.
the compressed air supply (3) and the WFE P to the compressed
When being operated with one soldering iron rest only, the
air outlet (4) and turn on the fume extractor.
second light guide inlet has to be kept sealed. To connect the
light guide (1) loosen the clamp nut and insert the light guide as
KHP:
far as the stop, then screw up the nut finger-tight. Now connect
Place the FE soldering iron in the soldering gun holder and make
the compressed air supply (3) and the WFE P to the compressed
sure that the light inlet (1) is completely covered by the soldering
air outlet (4) and turn on the fume extractor.
gun.
KHP:
KHP 81:
Place the FE soldering iron in the soldering gun holder and make
Insert the soldering gun plug into the socket in the safety rest.
sure that the light inlet (1) is completely covered by the soldering
Connect the safety rest connecting cable to the soldering station.
gun.
To ensure that the over-run control device functions properly, the
temperature of the soldering gun must be within the control
KHP 81:
range.
Insert the soldering gun plug into the socket in the safety rest.
The solder fume extractor WFE shuts down after approx. 20 sec.
Connect the safety rest connecting cable to the soldering station.
The WFE restarts when the soldering gun is removed from the
To ensure that the over-run control device functions properly, the
soldering gun holder.
temperature of the soldering gun must be within the control
range.
Standard setback (in digital soldering stations)
The solder fume extractor WFE shuts down after approx. 20 sec.
If the soldering tool is not used within a period of 20 minutes the
The WFE restarts when the soldering gun is removed from the
temperature will be automatically reduced to a standby tempe-
soldering gun holder.
rature of 150°C (300°F). After three setback periods
(60 min.) the "AUTO OFF" function will be activated and the
Standard setback (in digital soldering stations)
soldering iron will be switched off.
If the soldering tool is not used within a period of 20 minutes the
temperature will be automatically reduced to a standby tempe-
4. Maintenance
rature of 150°C (300°F). After three setback periods
To
ensure
that
the
(60 min.) the "AUTO OFF" function will be activated and the
it is important to ensure that the optical fibre (1) is connected
soldering iron will be switched off.
correctly between the holder and the control unit. If the optical
fibre is damaged, it can be cut to length again. In holders KHP,
4. Maintenance
the light inlet in the holder funnel must be cleaned with alcohol
To
ensure
that
the
(methylated spirit) at regular intervals.
it is important to ensure that the optical fibre (1) is connected
If the light inlet of the optical fibre (1) is damaged, the optical fibre
correctly between the holder and the control unit. If the optical
can be reinserted and cut to length again.
fibre is damaged, it can be cut to length again. In holders KHP,
For this purpose, the screw fitting of optical fibre (1) on the
the light inlet in the holder funnel must be cleaned with alcohol
soldering gun holder must be undone.
(methylated spirit) at regular intervals.
If the light inlet of the optical fibre (1) is damaged, the optical fibre
To replace the mains fuse, the control unit must be switched off
can be reinserted and cut to length again.
and isolated from the mains and the 4 control unit casing bolts
For this purpose, the screw fitting of optical fibre (1) on the
must be removed. The fuse holder for glass tube fuse (5x20) is
soldering gun holder must be undone.
on the circuit board.
To replace the mains fuse, the control unit must be switched off
and isolated from the mains and the 4 control unit casing bolts
must be removed. The fuse holder for glass tube fuse (5x20) is
on the circuit board.
device
functions
properly,
device
functions
properly,