Descargar Imprimir esta página

Mitsubishi Electric City Multi PLFY-P VBM-E Serie Manual De Instalación página 6

Ocultar thumbs Ver también para City Multi PLFY-P VBM-E Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 54
L N
M1 M2 S
1 2
TB2
TB5
TB15
1. Remove the electrical wiring service panel.
2. Remove the electrical box cover.
3. Remove the MA Remote controller terminal cover.
4. Wire the power cable and control cable separately through the respective wiring
entries given in the diagram.
Leave excess cable so that the electrical box cover can be suspended below the
unit during servicing. (Approx. 50 to 100 mm)
A Entry for remote controller cable
B Entry for power and control cable
C Clamp
D Electrical box cover
E Service panel for electrical wiring
F Temporary hook for electrical box cover
G MA Remote controller terminal cover
H Power supply terminals (with earth terminal) (L, N,
I Transmission terminals (M1, M2, S)
J MA Remote controller terminal (1, 2)
K Secure with the clamp
60227 IEC 53.
the air conditioner installation.
A Ground-fault interrupter
B
C Indoor unit
D Pull box
Warning:
)

Publicidad

loading