Descargar Imprimir esta página

Broan Elite E64000 Serie Manual De Instrucciones página 9

Ocultar thumbs Ver también para Elite E64000 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

6.
CHOOSE THE OPENING(S) (INTERNAL BLOWER HOODS ONLY)
Remove the knockout for the chosen opening(s) (horizontal at the back of the hood or vertical on top).
See illustrations below.
VERTICAL DISCHARGE
HORIZONTAL DISCHARGE
NOTE:
For
ducted
installation
only.
HR0021
hood. Install the wire clamp (included in parts bag).
A
4
B
Punch out the appropriate electrical knockout hole on top (A) or back (B) of the
re
re
|
NOTE:
For a non-ducted installation, punch out the back electrical knock-out (B).
HROO24
7.
HORIZONTAL DISCHARGE INSTALLATION (INTERNAL BLOWER(S) ONLY)
All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration. For a horizontal
discharge configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the back panel of the
hood. The procedure below applies for one or two motors.
Unplug the blower.
HEOO85
Lert Sipe Mountine
_ Screw Locarion
Using
a 5/16"
socket,
remove
all
blower
mounting
screws from the
inner top
of the
hood.
Keep
the
screws for further use.
MountTine Screw
Location

Publicidad

loading