CAUTION: DO NOT MIX REFRIGERANT TYPES.

Electrical and Gas Leak Checks

Electrical Safety Checks
After installation, confirm that all electrical
wiring is installed in accordance with local
and national regulations, and according to
the Installation section.
120
Additional amount of refrigerant
N.A.
Liquid side: Ø 6.35 mm (0.25")
R22:
(Pipe length - standard length) x
30 g/m
(Pipe length - standard length) x
0.32 oZ/ft
Inverter R410A:
(Pipe length - standard length) x
15 g/m
(Pipe length - standard length) x
0.16 oZ/ft
Fixed-frequency R410A:
(Pipe length - standard length) x
20 g/m
(Pipe length - standard length) x
0.21 oZ/ft

Before Test Run

Check Grounding Work.
Measure grounding resistance by visual de-
tection and with grounding resistance tester.
Grounding resistance must be less than 4.
NOTE: This may not be required in some US
locations.
Liquid Side: Ø 9.52 mm (Ø 0.375")
R22:
(Pipe length -standard length) x
60g/m
(Pipe length -standard length) x
0.64 oZ/ft
Inverter R410A:
(Pipe length - standard length) x
30 g/m
(Pipe length - standard length) x
0.32 oZ/ft
Fixed-frequency R410A:
(Pipe length - standard length) x
40 g/m
(Pipe length - standard length) x
0.42 oZ/ft