OPERATION
5.
7.
CHECK CONNECTION
•
Evaluate the rivet nut optically. Drill out a faulty rivet nut and replace.
•
Check to ensure that a firm and secure connection has been made between the rivet nut and the
work piece.
BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
6.
8.
Tel.: 02196 720480
Fax.: 02196 7204820
mail@bgs-technic.de
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed