Descargar Imprimir esta página

Pulsar G65BN Manual De Instrucciones página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Unpacking
1. Place box on a level surface.
2. Remove all items from box except the generator. Make sure all items listed on the packing list are included and
undamaged
3. Cut-down the sides of the box being careful to avoid touching the generator.
4. Leave generator on box to install wheel assemblies.
Packing List
Check all loose parts to the following list. Contact your dealer if any loose parts are not included.
Description
Generator
Operator's manual
Product registration card
Engine oil
Two stage regulator
Spark Plug Wrench
Toolkit
Funnel
Handle Assembly
+
+
+ + + +
+
+
ASSEMBLY
Qty
Description
1
Handle Assembly
1
Bolt
1
Bushings (Flanged)
1
Nut
1
Wheel Assembly
1
Axles
Washer
Hair pin
1
+ +
Foot Assembly
8
Qty
Description
2
Foot Assembly
2
Bolt
4
2
2
2
2
2
+
+
+ +
(
Qty
2
4
Wheel Assembly
+
)
OIL

Publicidad

loading