Descargar Imprimir esta página

Ravelli CLASSIC 7 Manual De Uso Y Mantenimiento página 72

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

MAINTENANCE
Safety warnings for maintenance
Maintenance of the stove must be performed at least once a year and should be planned in advance with the
Technical Assistance Service.
In some conditions, such as turning the stove on and off or inappropriate use, the combustion products can
contain small soot particles that build up in the smoke evacuation system. This can reduce the cross-section of
the smoke duct and pose a fire risk.
The smoke evacuation system must be inspected and cleaned at least once a year.
The maintenance operations must be carried out when the stove is cold and with the electrical power supply
disconnected.
Before completing any maintenance operation, adopt the following precautions:
Make sure that all stove parts are cold.
Make sure that the ashes are completely cold.
Always operate with equipment that is appropriate for maintenance.
When maintenance is finished, re-install all of the dis-assembled parts before restarting operation.
! IMPORTANT
Cleaning
! IMPORTANT
PARTS / FREQUENCY
Combustion chamber
Combustion grille
Ash drawer
Glass
Extraction duct
Glass cleaning
With a cold stove, clean the glass with a cloth and glass cleaner.
Note: there are stove glass cleaning products available on the market.
Automatic cleaning system
The main characteristic of this model is the automatic cleaning of the firepot. Consequently there is no more need to clean the firepot
periodically or at every start of the stove.
Cleaner working (rotation 360°)
Use and maintenance manual Classic 7-9
The quality of the pellet, the stove operating mode and combustion control can affect
maintenance activity frequency.
Perform the cleaning operations so as to guarantee correct stove operation. The table
below lists the necessary cleaning operations required for correct stove operation.
1 DAY
Ash-drawer: ashes are released underneath
the firepot
2-3 DAYS
Rev.1 06.02.18
Page 73
60-90 DAYS
EN

Publicidad

loading