Descargar Imprimir esta página

Viking VURE515G Manual De Instalación, Uso Y Mantenimiento página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
LEVELING INFORMATION
1.
Use a level to confi rm
the unit is level. Level
should be placed
along top edge and
side edge as shown.
1
2.
If the unit is not level, adjust the legs on the corners of
the unit as necessary.
3.
Confi rm the unit is level after each adjustment and
repeat the previous steps as needed.
INSTALLATION TIP
If the room fl oor is higher than the fl oor in the cutout
opening, adjust the rear legs to achieve a total unit rear
height of 1⁄8" (3 mm) less than opening's rear height. Shorten
the unit height in the front by adjusting the front legs. This
allows the unit to be gently tipped into the opening. Readjust
the front legs to level the unit after it is correctly positioned
in the opening.
Turn to Adjust
7
1.
Plug in the power/electrical cord.
2.
Gently push the unit into position. Be careful not to
entangle the cord or water and drain lines, if applicable.
3.
Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit's top
surface should be approximately 1⁄8" (3 mm) below the
countertop.
4.
Install the anti-tip bracket.
5.
Remove interior packing material and wipe out the
inside of the unit with a clean, water-dampened cloth.

Publicidad

loading

Este manual también es adecuado para:

5 serieVure524g