I stall ti
I structi
ns
efrigerator
Models 22, 23, 25, 26, 27 and 29
Questions?
Call 800.GE.CARES 1800.432.2737) or Visit our Website
at: ge.com
In Canada, call 1.800.561.3344
or Visit our Website
at: geappliances.ca
BEFORE YOU BEGIN
Read these instructions
completely
and carefully.
. IMPORTANT - Save these
instructions
for local inspector's use.
"
IMPORTANT
- Observe all governing
codes and ordinances.
,
Note to Installer-
Be sure to leave these
instructions
with the Consumer.
,
Note to Consumer
- Keep these instructions
for future reference.
. Skill level - Installation
of this appliance
requires
basic mechanical
skills.
, Completion
time - Refrigerator
Installation
30 minutes
Water Line Installation
30 minutes
.
Proper installation
is the responsibility
of
the installer.
,
Product failure due to improper
installation
is not
covered under the Warranty.
If the refrigerator
has already
been installed,
remove the base grille {see Step 2 in Moving
the Refrigerator},
then skip to Step 5 in Installing
the Refrigerator.
PREPARATION
WATER SUPPLY TO THE ICE MAKER
If the refrigerator
has on ice maker, it will have
to be connected
to a cold water line. A GE water
supply kit (containing
tubing, shutoff valve, fittings
and instructions)
is available
at extra cost from your
dealer, by visiting our Website at ge.com (in Canada
at geappliances.ca)
or from Parts and Accessories,
800.626.2002
(in Canada 1.888.261.3055).
TOOLS YOU WILL NEED
3/8" and 5/16" Socket
1/8" Hex Wrench
1/2" and 7/16" Wrench
U
Plastic Putty Knife
Phillips Head Screwdriver
25