—
I N S TA L L AT I O N I N S T R U C T I O N S
ReliaMod™ Modular Metering
RM5THJAW
Kit Contains:
Fifth Jaw Assembly
Screw
6 o'clock Position
—
ABB Inc.
305 Gregson Drive
Cary, NC 27511
United States
electrification.us.abb.com/reliamod
HAZARDOUS VOLTAGE .
WILL CAUSE SEVERE
INJURY OR DEATH.
Turn OFF power supplying this
equipment before working inside.
9 o'clock Position
—
We reserve the right to make technical
changes or modify the contents of this
document without prior notice. With regard
to purchase orders, the agreed particulars
shall prevail. ABB Inc. does not accept any
responsibility whatsoever for potential
errors or possible lack of information
in this document.
Please read these instructions
completely before installing
or removing device. Improper
installation could be hazardous
to personnel and/or equipment.
• Turn "OFF" power supplying the meter module.
• Remove the meter cover and meter where the 5
1
jaw installation will be done.
1
• Orient fifth jaw assembly in the 6 o'clock
or 9 o'clock position.
• Secure the fifth jaw assembly with the screw
provided to the meter socket base.
• Torques the screw to 25 in-lbf.
• Route the white wire to the neutral bar and torque
the set screw to 25 in-lbf.
We reserve all rights in this document
and in the subject matter and illustrations
contained therein. Any reproduction,
disclosure to third parties or utilization
of its contents – in whole or in parts – is
forbidden without prior written consent
of ABB Inc. Copyright© 2023 ABB
All rights reserved
th
Para consultar las instrucciones
en español, véase la página 2