17
ROUGH4N
DIMENSIONS
._
60
(152.4)
24 3¼
(62.9)
Power
Cord
331/z
(85)
SIDE
inch (cm)
36
(91.5)
Under
Counter
34%
(87.9)
Adjustable Legs
26%
"_
(67.9)
o
2%
(7.3)
Water
Inlets
31%
(80.3)
UNDER COUNTER INSTALLATION
If an under counter* installation is desired, the washer MUST have a
top sheet kit installed, P/N 131 445600.
Kit
is available
from
an
authorized
parts
distributor,
_Custom sized countertop
is required,
24 s/4
(62.9)
Power
Cord
33_/2
(85)
inch (cm)
Adjustable Legs
263/4
_'_
(67.9)
BACK
27/8
(7,3)
Water
Inlets
31%
(80.3)
LOCATION OF YOUR WASHER
DO NOT INSTALL
YOUR WASHER:
1. In an area exposed
to dripping
water
or outside
weather
conditions.
The ambient
temperature
should
never be below
60
degrees
F (15.6 degrees
C) for proper
washer
operation.
2. In an area where
it will come in contact
with
curtains
or drapes,
3. [n an area (garage
or garage-type
building)
where
gasoline
of
other
flammables
are kept or stored
(including
automobiles),
4. On carpet.
Floor MUSTbe
solid with
a maximum
slope of 1/2 in.
per foot
(1.27 cm per 30.5 cm). To ensure
vibration
or movement
does not occur, reinforcement
of the floor
may be necessary,
IMPORTANT
MINIMUM
INSTALLATION
CLEARANCES
When
installed
in alcove
or closet:
Sides, Rear - 0 in. (0 cm)
Top - 0 in, (0 cm) Front
Console
Model
Top - 15 in, (38.1 cm) Rear Console
Model
When
lnstalledln
closet:
Front
1 in, (2.54 cm)
Closet door
ventilation
required:
2 Iouvered
openings
each 60 in 2
(387 cm2), 3 in. (7.6 cm) from top
and bottom
of door.
UNPA CKtNG
1. Cut the shipping
carton
along
the dotted
line along
the base of the unit,
2, While
in the carton
carefully
Jay the washer
on its back side,
3. Remove the styrofoam
base,
4. Carefully
return
the
washer
to an upright
position
and remove
the carton,
5. Carefully
move the
washer
to within
4 feet
BOLT
(1 22cm)
of the final location.
(_
SPACER
6, Remove the following
from
the back side of the washer:
(_
3 bolts,
(}LAMP
3 yellow
plastic spacers,
2 or 3 metal
"P" clamps
7. Remove the service panel from
the front
of the washer,
8. Remove the 4 nuts and
6 large washers
that attach
the 2 yellow
shipping
braces
to the drum and the
base, Lift up on the
drum and remove
the braces (a yellow
ribbon
surrounds
the
items to be removed),
(_)
These braces must be
(_
removed
to allow the
power
supply
cord to
be released from
the
shipping
ring,
9, Remove the large
styrofoam
block located
under the drum,
Lift up on the
drum,
tilt the base of the foam
block
inwards
toward
the rear of
the washer
until free, then
pull it out.
10,
Remove and discard
the yellow
ribbon
and label from the
front
of the washer,
11, From the rear of the washer,
carefully
pull out the power
supply
cordthrough
the hole in the backsheet,
12, Replace the service panel and screws,
NOTE;
If the washer
is to be transported
at a later date, the shipping
support
hardware
must
be reinstalled
to prevent
shipping
damage,
Retain the hardware
in the plastic
bag provided