Installation
1
Preparing the floor
Do not install the shower base on open
CAUTION:
oor joists.
Strip the alcove to the bare studs. The studs should be plumb
and square to the sub- oor.
The oor must be clean, smooth, and level. Sub- oor must be
installed in the stud layout.
Cut a hole in the sub- oor to accommodate the drain (not included).
Staple the felt pad (C) to the sub- oor where the support feet on
the base (A) will make contact with the oor.
2
Leveling the base
NOTE: If the sub- oor is not level, a oor leveling
compound (smooth mortar) or a similar quick-setting
compound speci cally made for leveling oors is an
excellent way to fully support and level the base instead
of wood shims.
Trial t the base (A) in the prepared alcove. With the base (A)
sitting at on the oor, check with the level on top of the base (A).
It should be level from front-to-back and side-to-side.
If the base (A) is not level, install wood shims between the base
feet and the sub- oor as needed.
Remove the base (A) from the alcove.
5
Please contact 1-855-434-5224 for further assistance.
C
A
Shims
HOMEDEPOT.COM