turning it by 90° to the right or left according to the specific requirements.
2. Connect the fitting (1) to a sufficiently resistant rubber pipe (2) (so that it is not deformed
or throttled in any way).
3. Secure it with a pipe clip (3) and route it to an appropriate drain.
4. Make sure that the pipe slopes enough to allow the condensation to flow down natu-
rally.
5. Check the efficiency of the drain by pouring a small amount of water directly into the
tray of the outdoor unit.
Note: The kit is supplied together with the machine for the heat pump versions.
INSTALLING THE INDOOR UNIT
Choice of place of installation. In compliance with the conditions indicated in the "Installation Diagrams" section, posi-
tion the unit as low as possible, leaving 10 cm of free space over the unit. Before fixing it to the wall, check that the wall
can withstand the weight of the unit, that the air flow is not obstructed by curtains and the like and that the position is
suitable for guaranteeing optimum diffusion of air in the room.
Installation. After choosing where to position the indoor unit, use the fixing plate as a template in order to find the exact
position for the expansion plugs and for the hole through the wall. The overall space required for installation must be
considered. The plastic casing of the unit features pre-cut sections (see fig. 3 in the "Other installations of the mural
unit" section) that, if necessary, can be removed to allow the refrigerant lines and cables to be passed through.
Mod. 9000-12000
C
55
35
Mod. 18000
14
MACHINE INSTALLATION
A
B
55
110
Fig.2
Mod.
9
12
A
605
542
B
32
169
C
148
129
D
265
275
E
110
110