Descargar Imprimir esta página

PTC HPP CLW HT Serie Instrucciones Para El Ensamblaje Y Mantenimiento página 27

Bombas de alta presión

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40
SPECIAL MAINTENANCE – REFITTING THE HYDRAULIC PART AND PUMPING ELEMENT
To refit the parts, perform the operations described in the two previous paragraphs in the opposite sequence.
CAUTION
• All tightening operations must be performed using a special torque wrench, in accordance with the following chart:
• Head screw tightening is done in two different stages, following the sequence shown in the illustration:
• Pre-tighten at 40 Nm/29,5 lb.ft, then complete the operation by tightening at 85 Nm/62,7 lb.ft.
The product is covered by a 3 (three) year warranty from the date of delivery, as long as the buyer has complied with
contractual norms.
With regard to warranty acceptance procedures, refer to the general sales conditions.
Pos.
Description
11
Crankcase fixing screw
10
Plunger fixing screw
6
Head screw
2
Valve cap fixing screw
5
3
8
2
WARRANTY
Tightening torque
Nm (lb.ft)
10 (7,4)
27 (19,9)
40 (29,5)
85 (62,7)
45 (33,2)
1
7
4
6
EN
27

Publicidad

loading

Este manual también es adecuado para:

Clw 66/140 ht