TECHNICAL SPECIFICATIONS
ECO PRO
Output
Flow
Functioning
Fuel
Max Viscosity at 20°C
Electrical power supply
1 stage / 2 stage pump calibration
Motor
Max. absorbed power
Condenser
Trasformator (voltage / secondary current)
Electric protection rating
Noise level *
60° nozzle with vacuum / half-empty cone
Weight
* Sound pressure measured in the manufacturer's combustion laboratory, with burner operating on a test boiler
and at maximum output..
INSTALLATION ON TO THE BOILER
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4 and the possi-
ble insulating cord 5. Insert the burner in the flange so that the draught tube penetrates into
the combustion chamber by the length suggested by the boiler manufacturer. Tighten screw
UK
1 to lock the burner in position.
24
min
max
min
max
1,5 °E - 6 CSt - 41 sec; R1
230/50 o 60 single-phase
9/2
34,8
115
2,92
9,72
Two stages
Light oil
10/18
100
250
6,3
26 / 48
20
67
1,50
11,5
kW
kW
kg/h
kg/h
V/Hz
bar
W
W
μF
kV/mA
IP
dB(A)
GPH
kg