5.
Place the new splinter guard flush with the edge
of the adhesive surface on the left and start the
gluing process.
6.
Peel off the protective film on the splinter guard.
The adhesive is underneath the protective film.
Carry out the gluing process at a room
➢
temperature of 20 - 30°C.
7.
Glue the splinter guard to the right.
8.
Once inserted, press down firmly on the splinter
guard with your fingers.
9.
Cut off the splinter guard flush with the rail
using a carpet knife.
10. Make another cut and add a chamfer (approx.
45°) to the splinter guard.
11. Then re-insert the plastic stop plate 2.
12. Insert the screws for fastening into the holes 6
and tighten them.
The adhesive only acquires its final strength after 24 hours. During this time, the guiding device should not be
incised and no work should be done with the guiding device.
Damage to the new splinter guard due to blunt saw blade
The mounted new splinter guard must be cut to size to fit the saw before the first cut.
Use a sharp saw blade to prevent the splinter guard from tearing out.
Fig. 3: Gluing in the new splinter guard
Fig. 4: Incising the new splinter guard
Fig. 5: Insert the plastic stop plate
-9-