Descargar Imprimir esta página

Panasonic PAW-TD23B6E5AN Manual De Instalación página 7

Publicidad

3.3.2 Pipe connections and valves
Ref.
Dim. Description
a
ø22 Radiator circuit return
b
ø22 Domestic cold water in
c
ø22 Domestic hot water out
d
3/4" Temperature and pressure valve (T&P)
e
ø22 Radiator circuit flow
f
ø22 Heat pump circuit return
g
1/8" Air vent valve for heating system
h
ø22 Heat pump circuit flow
i
DN15 Drain valves (DHW tank & buffer tank)
3.3.3 Transport and unpacking
The product should be transported carefully,
with packaging. Also please note:
The product is very heavy and should not
be lifted by one person alone.
Do not transport the unit horizontal. This
can cause damage or failure.
To avoid hand injury, wear gloves when
moving the product and/or while remov-
ing the packaging.
Be careful not to damage the product
while removing the packaging.
To avoid damage an installed tank must
be drained before moving.
!
Pipe stubs, valves etc. should not be used to
lift the product as this could cause malfunc-
tions.
3.4 Requirements for installation, location
and positioning
The product shall be placed in a room with a drain to avoid any damages in case of water
!
escaping from the product.
The product must be placed in an area that is dry, clean, free of vapour, volatile oils,
!
smoke and gases to avoid any damages to internal parts of the product.
!
The product shall be placed in a dry and permanently frost-free position.
The product shall be placed on a floor surface suitable for the total weight of the product
!
when in operation. See product data plate.
Install the tank unit as close to the heat pump as possible. This limits the necessary vol-
!
ume of coolant (due to pipe length).
!
The product must have a service clearance of 120 cm in front of the cover / 50 cm on top.
!
The product shall be easily accessible in the home for servicing and maintenance.
CAUTION
a
b
c
d
e
f
g
h
i
!
CAUTION
7

Publicidad

loading

Este manual también es adecuado para:

Paw-td23b6e58034199080341993