Descargar Imprimir esta página

Project Source 67124W-6204 Instrucciones De Montaje página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION INSTRUCTIONS
1.
Flushing and checking for leaks:
1
Important: After installation is complete, remove
the aerator (1) with a coin (2) to flush the water lines.
Turn on the water supply and allow both hot and cold
water to run for at least one minute each. This flushes
away any debris that could cause damage to internal
parts. While the water is running, check for leaks.
1
Turn off the water and replace the aerator.
2
9

Publicidad

loading

Este manual también es adecuado para:

67124w-62700167124w-624408564941856678975667901