Operation
4
Operation
4.1
Before commissioning
Before each start of work, check that there is sufficient hydraulic oil in the oil tank and that the
battery (12 V battery) is fully charged.
Recommendation: Fully charge the battery after each end of work.
51200081
A suitable 12 V charger must be used to
charge the battery.
The battery can either be charged via the 12
V charging socket
poles of the battery.
ATTENTION: ensure correct polarity of the
connection terminals (
To do this, simply remove the cover
battery box (by loosening the wing nut).
The oil level must be 2 to 3 cm below the top
edge of the oil tank
If necessary, hydraulic oil HLP-32 (according
to ISO4407/1999) must be refilled using a
HLP 32
funnel or similar.
To do this, remove the screws on the front of
the oil tank cover with a suitable tool and then
remove the oil tank cover .
9 / 16
or directly at the +/-
+ +/ - -
)
❷
of the
❸.
GB