Descargar Imprimir esta página

probst STS-43-EH-23 Instrucciones De Uso página 36

Ocultar thumbs Ver también para STS-43-EH-23:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 126
Operation
4.3
Equipment transport
The empty unit (without stone plate) may only be transported (moved) by hand by lifting/gripping the
transport lever
To do this, the transport lever
Alternatively, the empty unit (without stone
slab) can also be transported (lifted) using a
crane, wheel loader, etc. on the additionally
attached suspension eye
For this purpose, use a safe and suitable
sling such as a chain, sling, crane hook or
similar.
51200081
(or the red handles
must be moved to the horizontal position. → Fig. 2
Fig. 1
❽.
on the side).
12 / 16
Fig. 2
Fig. 3
GB

Publicidad

loading

Este manual también es adecuado para:

51200081