Assembly & Set-Up
3
Contentsof Carton
One Snow Thrower
One Snow Thrower
Operator's
Manual
Two Replacement
Auger Shear Pins
One Product Registration
Card
One Chute Assembly
Assembly
Setting UpThe Handle
I.
Remove cable tie (if present) securing
upper handle to
lower handle for shipping
purposes.
Remove all protective
plastic wrapping
from handles.
NOTE: Be careful NOT to remove the three loosely fitted
cable ties that will be utilized
later to secure cables.
2.
Loosen and remove the wing knob, saddle washer, handle
tab and carriage screw on each side of the lower handle.
See Fig. 3-1.
3.
Figure 3-1
Slide one of the loosely fitted
cable ties from the right side
of the lower handle up to the cross member
of the lower
handle. Leave the second cable tie in place on the right side
of the lower handle. See Fig. 3-3 for reference.
IMPORTANT:
It will be necessary to lift the upper handle while
sliding up this cable tie to prevent damage to the cable.
4.
Lift the upper handle up and position it over the lower
handle, aligning the holes where the wing knobs were
removed (1).See Fig. 3-2.
CAUTION:
Be careful not to bend or kink the cables.
5.
Insert a carriage screw from the outside
through
a handle
tab, the upper and lower handles, a saddle washer and into
the wing
knob (2). Repeat on the other side.
6.
Tighten
the wing
knobs on each side of the handle. Refer
to Fig. 3-2.
7.
Figure 3=2
NOTE:The
auger cable routes down the left lower handle
and the drive cable is routed across the top of the lower
handle and down the right side of the lower handle. See
Fig. 3-3.
Three cable ties have been used to loosely tie the control
cables to the lower handle, including
the cable tie you
relocated
in step 3. Position cable ties now, as in Fig. 3-3,
and tighten
to secure cables to the lower handle. Trim off
excess material
of cable ties.
er Cable
Figure
3-3