7.
Determine whether to install programmable
handset (9) in pilot holes located on the left or right
side of the desktop (1). In desired location, align
with pilot holes and install using two ST5 x 16 mm
screws (G) and Phillips screwdriver. (See Figure 5)
Figure 5
8. Connect the power cord (K), programmable
handset (9) and lifting column cables to the control
box (7). (See Figure 6)
Figure 6
K
9
Lifting Column
Cables
Power Cord (K)
PAGE 3 OF 21
ASSEMBLY CONTINUED
1
G
9
1
J
1
7
Handset Cable
NOTE: One of the pre-installed lifting column
cables will not reach control box (7). Use the
extension wire (J) to connect lifting column
cable to control box. (See Figure 6)
9. Position loose cords underneath the cable
management tray (8). Attach the cable
management tray to the center frame (6) using four
or eight M6 x 10 mm bolts (E). (See Figures 7-8)
• For 60" Desks, use eight M6 x 10 mm bolts to attach
cable management tray. (See Figure 7)
Figure 7
E
8
• For 72" Desks, use four M6 x 10 mm bolts to attach
cable management tray. (See Figure 8)
Figure 8
E
6
8
8
6
8
1123 IH-11111