Descargar Imprimir esta página

RAV KTE100 Instrucciones De Uso página 179

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 84
KTE100
Inspection, testing and maintenance
7.4
Maintenance
7.5
Maintenance plan
Lifting tables in continuous operation or in a particularly polluted environment must be serviced more of-
ten.
An additional check is required after replacement of safety-relevant parts during maintenance work.
Interval
Before each use
Weekly
Monthly
Quarterly
Biannual
Annual
183
Note
Damage to property, wear and tear
Maintenance work may only be carried out by qualified personnel or per-
sonnel trained for this purpose.
Regular maintenance and care extends the service life.
To ensure maintenance work by possible maintenance contracts with a
contractual partner of the company Ravaglioli S.p.A..
Maintenance activities
Test:
Perfect operation of the controls
Visual inspection:
Type / Note / Warning labels / Safety stickers
Safety devices
Check foot pedal function and condition.
Check the running of the lifting carriage rollers.
If available, check sliding pieces and grease them with multi-
purpose grease.
Cleaning (→7.6) More often in case of particularly polluted
environment/continuous operation.
If available, grease sliding pieces with multi-purpose grease.
Test:
Check the track of the sliding rollers for wear.
If available, check sliding pieces and grease them with multi-
purpose grease.
Check foot pedal function and condition.
Visual inspection of welds
Greasing the threads
In particularly polluted environments/continuous operation
more often.
Oil level control (→7.8)
Check fastening screws with torque
Regular tests (→test book)
Control hydraulic hoses
Check surfaces (painting, coating...) (→7.7)
131017

Publicidad

loading