Starting The Grinder; Installation And Start-Up - Crem Pulse Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Starting the grinder

Insert the hopper into its seat; positioning it so that
the hole lines up with the screw on the back part of
grinder.
Remove the cover from the hopper and fill it with
coffee beans.
After having filled the hopper, switch ON the grinder
on the ON/OFF switch.
10

INSTALLATION AND START-UP

01
Tighten the lock screw.
03
Connect the machine to the mains socket and pull the
tab at the bottom of the hopper to open it.
05
Select single or double dose by pressing the
corresponding keys
or
.
02
04
06

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mb28a

Tabla de contenido