Descargar Imprimir esta página

DJI DOCK 2 Guía De Instalación Rápida página 4

Ocultar thumbs Ver también para DOCK 2:

Publicidad

1.
Wind Speed Gauge
2.
Security Camera
3.
Camera Auxiliary Light
4.
Rainfall Gauge
5.
Dock Cover
6.
Positioning Markers
7.
Landing Pad
8.
Aircraft Orientation Marker
9.
Carrying Points
10. AC-IN Port
11. Earth Wire (located underneath the dock)
12. Electrical Cabinet
13. LAN-IN Port
14. Mounting Base Brackets
15. Emergency Stop Button
16. Status Indicators
17. Dongle Compartment
18. Wire Testing Terminals
19. Surge Protector Circuit Breaker (SCB)
[1] DJI Dock comes with a built-in charging module. Make sure that the landing pad surface is clear
of any metal objects in order to avoid high temperatures that may damage the landing pad.
[2] The dock cover will fail to open or close if the emergency stop button is pressed.
[3] Press and hold the button when opening and closing the cover. Make sure that there are no
obstacles blocking the dock cover. Keep a safe distance from the dock cover to avoid injury
when opening or closing the dock cover.
 Installation
3
Confirming Installation Position and Orientation
Make sure to consider the below factors before installing the dock.
• Make sure the orientation of the security camera on the wind speed gauge module is not facing
direct sunlight. Otherwise, the service life of the product and camera view may be affected due to the
environmental factors.
• Make sure there are no obstacles blocking the dock covers.
• To avoid false detection when the aircraft lands, make sure that there are no light-colored objects similar
to the shapes or visual identification markers on the landing pad within 5 m of the dock, such as white
rectangles, white triangles, and H patterns.
• If multiple docks are installed at the same location, the distance between each dock should be at least 5 m.
It is recommended to be 10 m.
• The length of the earth wire is 0.5 m. Make sure that the distance between the earth electrode and the
dock is less than 0.5 m.
Installing the Expansion Bolts
• Wear a dust mask and safety goggles when drilling holes to prevent dust from entering the eyes,
nose, and throat. Pay attention to personal safety when using any electrical tools.
A concrete base or steel frame base needs to be fabricated in advance at the installation site. The following
installation instructions use a concrete base as an example.
[1]
[2]
18
19
20
20. AC Power Switch
21. Backup Battery Switch
22. USB-C Port
23. USB-A Port
24. Electrical Cabinet Indicators
25. Link Button
[3]
26. Close Button
[3]
27. Open Button
27
26
25
24
2122 23
3

Publicidad

loading