Descargar Imprimir esta página

Levenhuk Wezzer PRO LP380 Guia Del Usuario página 7

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 53
Levenhuk Wezzer PRO LP380 Weather Station
EN
The kit includes: display console, Y-shape outdoor sensor (thermohygrometer / rain gauge / wind speed sensor, UV/light
sensor), wind vane, 5V DC adapter, U-bolt with mounting clamps, zip bag for 10mm single-head wrench, user manual, and
warranty card.
Caution! Please remember that mains voltage in most European countries is 220–240V. If you want to use your
device in a country with a different mains voltage standard, remember that use of a converter is absolutely
necessary.
Getting started
Pre-installation checkout
Before permanent installation, it is recommended to use the weather station for a week in easily accessible temporary
location. This will allow you to test its performance, to become familiar with its functions and controls, and to determine its
wireless range.
Site survey
Perform a survey of the site before installation. Consider the following:
Maintenance access. Regularly clean the rain gauge and swap batteries every 2–3 years. Ensure easy access
to the weather station.
Radiant heat from buildings and structures. Install the multisensor at least 1.5m from any buildings, structures,
ground, or rooftops.
Rain and wind obstructions. For precise measurements of wind and rain, install the multisensor at a height at least
4 times that of the nearest obstacle. For example, if the building is 6m tall, the sensors should be installed at a height
of at least 30m from the ground.
Wireless range. The optimal distance between the receiver and the transmitter is up to 100m in an open space.
With obstacles in the way (buildings, trees, etc.), the maximum distance is 30m.
Radio interference from computers, radios, or TVs. Install the display console at least 1.5m away from electronic
devices to minimize interference.
Sensor setup
Installing U-bolts and the mounting pole
Install the included metal plates to secure the U-bolts (12) to the mounting pole. The metal plate (12) is inserted into
the groove on the bottom of the device (opposite side from the solar panel (7)). One side of the plate has a straight edge
(inserted into the groove), the other side is bent at a 90-degree angle and has a curved profile that wraps around
the mounting pole.
After inserting the metal plate, remove the nuts from the U-bolts and insert both bolts into the corresponding holes
in the plate.
Screw the nuts onto the ends of the U-bolts. Make sure to tighten them completely during final mounting.
7

Publicidad

loading

Este manual también es adecuado para:

82932