Recommendations for compressors intended for wells:
CSD 5 / AD
• Open the top cover of the Control Box by removing the screws. (Figure 6.12)
• Insert the float switch installation cables through the cable gland at the bottom of the Control Box.
(Figure 6.13)
• Remove the jumper. (Figure 6.14)
• Screw the float switch installation cables where indicated. Next, close the top cover. (Figure 6.15)
• For wiring see the wiring diagram at the end of the manual.
FIGURE 6.12
FIGURE 6.13
FIGURE 6.14
FIGURE 6.15
ATTENTION
Installation only with an electric float.
Well depth of up to 60 meters of water column.
54