Descargar Imprimir esta página

Glacier bay HD67679-5104 Guía De Uso Y Mantenimiento página 6

Dorind - grifo de banera monomando, independiente, con montaje de piso y ducha de mano

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
5
Installing the floor
Wood oor installation: Cut a hole with a
diameter of 4-1/2 in. to 5-1/2 in. in the sub oor
to install the faucet.
4-1/2 in. to
5-1/2 in. dia.
6
Removing the excess plaster guard
After laying the oor, use a saw to remove the excess plaster guard (L) from the exposed oor.
Loosen the plug (M) with the hex wrench (S, HEX: 6mm) from the rough body (N).
Sub oor
Joist
Stringer
L
Concrete oor installation: Laying concrete after
installing the rough.
NOTE: The minimum thickness of concrete is 1-5/8 in.,
and the thickest installation thickness must not exceed 3 in..
3 in. Max. to top
of Finished Floor
1-5/8 in.
Concrete
Min.
Joist
L
6
Plasterguard
Finished Floor
Stringer
S
M
N

Publicidad

loading

Este manual también es adecuado para:

Hd67679-5110h101 0678 970101 0678 971