Descargar Imprimir esta página

Celexon CLR HomeCinema Performance UST Manual De Instrucciones página 22

Pantalla de marco de alto contraste

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
STEP 5: WALL MOUNTING
Lift the screen with two people, tilt it
slightly forwards and place it in the cen-
tre of the wall bracket. Hook the screen
into the mounting brackets at the bottom,
press it slightly upwards and hook it in at
the top to finalise the installation.
Dismantling is carried out in reverse order.
The screen can be pushed slightly to the side for horizontal alignment. For
vertical adjustment, the screen must be removed and the position of the straps
on the wall bracket should be adjusted.
When loosening the fastening straps, make sure to hold the profiles firmly to
prevent them from slipping down.
celexon Europe GmbH | Gutenbergstraße 2 | 48282 Emsdetten | DE
Loosen these two screws slightly, to adjust
the height of the screen.
3. Hanging into the
brackets
2. Simultaneously lift both
sides at the same time.
1. Align with the wall
bracket.
Spring hook
S6
10

Publicidad

loading

Este manual también es adecuado para:

1000029153