Descargar Imprimir esta página

Kohler K-T72771-9M-CP Instrucciones De Montaje página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Front Plate Assembly
Screws
3. Install the Trim
Firmly press the valve stem adapter onto the valve stem.
Secure the valve stem adapter to the valve stem with the correct
length screw, as selected in the "Install the Valve Stem Adapter"
section of this guide.
Align the holes on the front plate assembly and the valve.
NOTE: Be sure to select the correct length screw for your
application.
Attach the two screws through the front plate assembly and into
the valve. Do not overtighten.
Visually inspect the front plate assembly to ensure that the foam
seal is completely covering the wall opening. If not, stop the
installation and repair the wall opening.
Place the escutcheon against the wall. The drain holes in the
escutcheon should be positioned downward.
Thread the handle assembly onto the hub of the front plate
assembly to secure the escutcheon in place. The handle will be in
the closed, vertical 6 o'clock position.
NOTE: If the handle does not engage the valve or the escutcheon
does not tighten to the wall, replace the valve stem adapter with an
adapter of appropriate length.
1204801-2-A
Valve Stem Adapter
Screw
Escutcheon
6
Handle Assembly
Kohler Co.

Publicidad

loading