Assembling the grain funnel
Start by assembling (A) the funnel cover (04), using the M6 x 30 mm
screw (05), the washer (06) and the M6 2-tips knob (07).
Fit the grain funnel (B) into the green product chute [Fig. 02].
Assembling the cushions on the shredder base
At the ends of the base it is necessary to assemble the four cushions. It helps level the product and
prevents vibrations when turned on. To fix it, insert the four cushions (08) into the holes and then use
the M8 self-locking nuts (09) [Fig. 03].
WORKING CONDITION AND INSTRUCTIONS FOR USE
Supply
Oil
This engine comes out of the factory without lubricating oil. Remove the dipstick and fill with 600 ml
of 10W30 Synthetic oil. First oil change after 5 hours of use. Subsequent changes must be made
every 50 hours of work or 6 months, whichever comes first.
The absence of oil, insufficient oil, excess oil or oil other than that recommended will cause
damage to the engine and does not constitute a warranty.
Gasoline
Always use good quality gasoline and do not store it for more than 30 days, as it affects the engine's
working condition.
The tank has a capacity of 2.8 L.
Allow the engine to cool for at least two minutes before refilling with gasoline to avoid explosions.
Do not leave gasoline in the tank. Use the shredder until you run out of gasoline to prevent it from
building up in the carburetor. Do not mix oil with gasoline.
TRC30
09
09
08
Fig. 03
TRC40
09
09
08
EN
Fig. 02
17