Descargar Imprimir esta página

MESTIC SMART ADVENTURE MI-500 Instrucciones De Uso página 32

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 86
Battery connection:
1. A fast-acting fuse must be installed on the battery side, adhering to the following requirements:
• The voltage rating of the fast-acting fuse should be 1.5 to 2 times the inverter's rated voltage.
• The current rating of the fast-acting fuse should be 2 to 2.5 times the inverter's rated current.
• The distance between the fast-acting fuse and the battery should not exceed 150mm.
AC load connection:
1. The AC loads shall be determined by the continuous output power of the inverter. Ensure that
the surge power of the AC load is lower than the instantaneous surge power of the inverter;
otherwise, the inverter may be damaged.
2. Do not ground the N pole of the AC output port.

Publicidad

loading