2. Select the master mode for one of the batteries by deactivating its DIP switch 4 (2).
3. Select the slave mode for all other batteries by activating their DIP switches 4 (2).
4. Establish the N-BUS network by connecting the batteries with cables (4) equipped with RJ12 6C/6P plugs (3).
When several batteries are connected in parallel on the N-BUS network, only one must be configured as Master
and the others as Slave
5. Connect the negative terminals (5) of the batteries.
6. Connect the positive terminals (6) of the batteries.
11 Wire and fuse sizing
In order to properly dimension wiring and fuses the distances and loads must be analysed. As it is not possible to
provide a unique figure valid for every application, the following examples are purely indicative.
Estimated maximum
consumption
20 A (refrigerator,
lights, water pump)
130 A (inverter with
coffee machine, and
hairdryer)
200 A (inverter with air
conditioner)
12 Operation
NOTE Always charge the battery completely before using it to its full potential.
Activation
The factory setting for the battery is the inactive mode: No voltage is present at the terminals. To use the battery it
must be activated and switched on.
(Selecting the desired BUS
Length ≤ 2 m
Maximum wire cross-section
Length 2 m ... 4 m
4 mm²
25 mm²
35 mm²
on page 8).
Length ≥ 4 m
6 mm²
35 mm²
50 mm²
10 mm²
50 mm²
70 mm²
    EN
Fuse
40 A
150 A
200 A
11