n n s s t t r r u u c c t t i i o o n n s s f f o o r r A A n n c c h h o o r r i i n n g g S S w w i i n n g g • • N N • • S S l l i i d d e e A A c c t t i i v v i i t t y y C C e e n n t t e e r r s s
I I
1. Determine the final location of your activity center.
Flat Washer
2. Place the Anchor- It stakes adjacent to the base and near the corners of
your activity center (at the bottom of the legs on swing sets) and twist the
auger- style stakes into the ground until only the loop is exposed.
3. Place the metal strap through the loop of the Anchor- It stake and secure
it to the unit with a lag screw and washer as illustrated to the right.
Note: Attach the strap to the unit with as little play as possible using
whatever holes in the strap that work best.
1-1/2"
lag bolt
Fig. 20a
Slide Installation.
1. Install Slide centered in the provided opening as
shown in (Fig. 20).
2. Prepare a level area of ground where the bottom of
the slide rests 2" below grade (Fig. 20a).
3. Mark where the slide's bottom meets the ground and
drive a 2" x 4" x 12" stake until its top is 2'' above
the grade prepared in Step 3. For reference, see
(Fig. 20a).
4. Attach Slide to Stake using (2) 1-1/4'' screws as