Descargar Imprimir esta página

enphase IQ-EVSE-NA-1040-0100-0100 Manual Del Usuario página 26

Publicidad

Idiomas disponibles

Idiomas disponibles

IQ EV Charger User Manual
EVSE mounting for solid-wall construction
To secure the unit in concrete, pre-drill appropriately sized holes
and use multi-set or wedge anchor hardware at both mounting
points.
To secure the unit in brick or stone, pre-drill appropriately sized
holes and use sleeve anchors at both mounting points.
The included plastic angle washers can be oriented to allow bolts
to be fastened at an angle or perpendicular to the mounting
surface.
NOTE: There are two different sets of plastic angle washers
included. Select those washers that best accommodate the
mounting hardware "angle of attack" and orient them
accordingly.
NOTE: If the head of the mounting hardware is smaller
than the ⅜" (1 cm) plastic angle washer aperture, an
additional flat washer must be placed between the plastic
angle washer and the mounting hardware.
Machine screw size ¼"- 20 hardware is recommended for
mounting the EVSE. Screw shafts of at least 2" (5.1 cm) are
recommended. The EVSE plastic angle washer hole size is ⅜"
(1 cm) in diameter, make sure the screw heads are of a larger
diameter. Place appropriately sized washers between the screw
heads and the IQ EV Charger enclosure mounting flanges.
Figure 11: Mounting EVSE to a solid-wall
17"
26

Publicidad

loading