On-site checklist
● Is the green diode in the control panel on
(Power check)
● Temperature records ( manual records,
FT2 data)
● Is the internal temperature inside the
acceptable range of +2° to +8°
● Is the vaccine compartment clean and
without condensation (water)
● Is the Compressor running
● Is baskets used and in place
● Is the appliance placed according to
instruction in the manual.
● Does the lid close tight to cabinet and is
the lid gasket in good condition
● Is the grille for compressor compartment
clean
● Is the condenser coils on the backside
clean
● Is all electrical components working
properly
● Over all condition of the cabinet –internal
and external: any corrosion, rusting,
cracks
● PV Panels clean and mounted according
instructions
● PV Panel installation/condition
● Check if any risk of shading on the PV
Panels
● Condition of the cables from the panel to
the compressor including the lightening
protection
31
GB