EU DECLARATION OF CONFORMITY
We, ALTENERGY POWER SYSTEM INC.
Of
Building 2, No. 522, Yatai Road, Nanhu District, Jiaxing City, Zhejiang 314050, China declare under our sole responsibility that the product
Product Description: Energy Communication Unit
Model No.: ECU-C
to which this declaration relates, is conformity with the following standards and/or other normative documents.
Safety
Health
EMC
Radio
We hereby declare that all essential radio test suites have been carried out and that the above named product is conformity to all the essential
requirements of directive 2014/53/EU (RED).
Title: Director
Address: Jiaxing, China
Date: 2022/10/11
Zigbee Frequency Range:2405MHz - 2480MHz
Zigbee Maximum Power (EIRP):8.77 dBm
Wi-Fi Frequency Range:2412MHz - 2472MHz
Wi-Fi Maximum Power (EIRP):14.84 dBm
Importer: Altenergy Power System Europe B.V
Address: Karspeldreef 8, 1101 CJ, Amsterdam, The Netherlands
Email: info.emea@apsystems.com
Manufacturer: Altenergy Power System Inc.
Address: Building 2, No.522, Yatai Road, Nanhu District, Jiaxing City, Zhejiang 314050, China
(No.20221011)
EN IEC 61010:2010+A1:2019
EN 62479:2010
EN 50663:2017
EN 301 489-1 V2.2.3 (2019-11)
EN 301 489-17 V3.2.4 (2020-09)
EN IEC 61000-6-1:2019
EN IEC 61000-6-2:2019
EN IEC 61000-6-3:2021
EN IEC 61000-6-4:2019
EN 300 328 V2.2.2 (2019-07)
2
EN
APsystems Energy Communication Unit ECU-C Quick
Installation Guide
This guide is for reference only and applicable to APsystems energy communication unit ECU-C. For more information about the settings and
functions of ECUs, download the EMA Manager and read the detailed instructions in the user manual (available at www.APsystems.com).
Step 1: Power on ECU-C.
To install the ECU-C in YC1000, YC600, QS1, DS3, DS3D, QT2, and QT2D systems, connect the power cable to the AC input port. You can also
connect the DC input port of ECU-C to obtain power through a 16V DC power cable. If only single-phase power is needed, L1 must be connected.
L1
L2
Three-Phase
√
√
Single-Phase
√
×
Note: Do not put antennas inside a metal box; otherwise, the signals will be blocked. If the roof is made of metal, use extension antennas and
place them outdoors or on the roof.
Scan the QR code to download our apps from the browser. (The EMA app is applicable to end users and DIY users, whereas the EMA Manager
app is designed for professional installers.)You can also click this link to download the apps: http://q-r.to/1OrC
Step 2: Register for an account.
1.Connect your mobile phone to the internet, open the EMA APP, click on "New Account," and create user information.
2.Enter the required "Account Info," "ECU Information," and "Inverter Information" in sequence.
3.Once completed, click on the "Complete Registration" button at the bottom to finish registering your account.
L3
N
PE
√
√
√
×
√
√
3
EN