Commissioning, Operation - WIKA A5301 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Transport... / 6. Commissioning, operation
GB

6. Commissioning, operation

When screwing the gauges in, the force required for this must not
be applied through the case or terminal box, rather only through the
spanner flats provided for this purpose (using a suitable tool).
Installation with
spanner
When mounting a bimetal thermometer that can be rotated and
swivelled, the specific instructions must be followed. In order to set
the indicator to the desired position, the following steps must be
taken:
1. The lock nut or union nut must be loosened at the process
connection.
2. The hexagon bolts and slotted screws at the swivel joint must be
loosened.
10
WARNING!
Before storing the instrument (following operation),
remove any residual media. This is of particular
importance if the medium is hazardous to health, e.g.
caustic, toxic, carcinogenic, radioactive, etc.
The use of liquid damping is always recommended for
temperatures near the dew point (±1 °C around 0 °C).
WIKA operating instructions models 53, 54, 55

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S5412R5502

Tabla de contenido