Operational Test And Start-Up Diagnostics - Watts TRITON Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Equipment Setup & Usage Instructions

Operational Test and Start-up Diagnostics

NOTICE
BEFORE plugging Power Cord into
electrical outlet (receptacle) make
sure power (On/Off) switch is in Off
position.
STEP 1
Turn on Control Unit
• Plug Control Unit into grounded
110/120VAC electrical outlet (receptacle) .
• Toggle power switch to On position .
STEP 2
Fuser Start-up
• The Control Unit display should read
"Fuser Found!" alternating with "Press
Trigger to Calibrate Fuser" .
• If the Control Unit display reads "Fuser
Error" alternating with "Check Fuser and
Cable Connection" then double check the
connections to ensure they are secure .
STEP 3
Calibrate Fuser
• Depress Fuser Button as shown (A) for
approximately 2 seconds and release .
This allows the Control Unit to recognize
the Fuser's size and profile .
• When ready the Control Unit display
ready button will turn green . When
ready the Control Unit display will read
"Fuser Ready to Start" alternating with
"Assemble Fitting & Attach Fuser ."
12
• The Fuser jaws must be closed to initiate
calibration . If the display reads "Please
Close Fuser Jaw" then close the Fuser
jaws by depressing Fuser Tongue .
• The Control Unit will chirp until the calibra-
tion process starts .
Fuser Button
A

Publicidad

Tabla de contenido
loading

Tabla de contenido