english
Fig. 20
A
9. Cut out the appropriate openings in the convection chamber.
Note that the hole (Fig. 20A) for the hot air distribution is
crescent shaped.
10. Assemble the outside air connector (Fig. 19F) and attach the
flexible outside air duct with a hose
14
clip.
fig. 31
1
15,4 cm
15,2 cm
15,0 cm
14,8 cm
5
5
6
1. Measure the external diameter of the flue pipe.
2. Cut a piece of the thick, self-adhesive gasket that is
provided.
3. Apply the gasket to the adapter. Start with step 3 (Fig. 31).
4. Apply the thin gasket as illustrated in step 4 (Fig. 31).
5. Remove the two screws from the smoke outlet on the burn
chamber (Fig. 31-5).
6. Fasten the two 35 mm screws (from the bag) as illustrated
in step 6 (Fig. 31).
7. Fasten the two nuts outermost on the screws as illustrated
in step 7 (Fig.
31).
2
55 cm
65 cm
75 cm
105 cm
3
5
4
7
6