Omcan BC-CN-0170-C Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Note: Two of the casters include locking mechanisms to ensure the unit does not slide on hard floors. These
two locking castors should be fastened at the front end of the unit, with the unlocked casters fasted on the rear
end.
Installing the beer tap
Follow the steps below to install the beer tap. There are notches on the bottom of the draft arm assembly that
line up with grooves inside the opening on the top of the beer keg fridge. Align the draft arm with the opening
on the top of the unit, then place inside and twist until secure. No screws are necessary, it locks into place
simply.
Pay attention to use the thin black gasket for assembly.
Installing the Guardrail
Follow these steps below to install the guardrail.
1. Place the guardrail on top of the cabinet.
2. Align all support feet of the guardrail with the holes on top of the unit.
Installing the CO
Regulator and the CO
2
Follow these steps to safely install the CO
following procedures for the CO
Note: Your CO
cylinder has DOT (USA Department of Transportation) approval, however the cylinder has
2
been shipped empty to avoid any possible accidents during transportation. When you purchase the first keg of
beer, you must also have your CO
1. Install the CO
gas line tube to the regulator by attaching one end of the tube to the hose barb connection
2
on the CO
regulator.
2
2. Insert the special washer (provided with the kit) into the regulator to cylinder attachment nut.
3. Attach the CO
regulator to the CO
2
tightening with an adjustable wrench.
4. Wrap the rubber strap that is attached to the interior of beer keg fridge unit around the CO2 bottle to secure
the bottle in place.
5. Position the cylinder so that you would be able to read the numbers on the gauges and have easy access
to shut-off valves.
Danger
CO
can be dangerous! CO
2
improperly. They must be handled with care.
Tapping the Beer Keg - Installing Keg Tap (Single Valve Type Barrel)
Follow these steps below to tap the beer keg.
1. Make sure the black pull handle of the tap is in the closed (up) position before installing it on the keg. Insert
the keg coupler into the locking neck of the beer keg and turn clockwise 1/4 to lock it into position.
2. When connecting the beer line, it is very important that the black rubber washer be installed inside the wing
nut before connecting the beer line to the tap. Remove the black rubber protective cap located on top of tap
Cylinder
2
regulator and CO
2
cylinders before installation.
2
cylinder filled at your local supplier.
2
cylinder by screwing the regulator nut onto the cylinder valve and
2
cylinders contain high-pressured gas, which can be hazardous if handled
2
cylinder. You must read and understand the
2
7
Installation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bc-cn-0170-u2382923720

Tabla de contenido